GoldMold has managed manufacturing of technical parts and products in China for Israeli companies since 1997. A senior engineer in Israel personally reviews every project's design, GoldMold's engineering team in China follows production on the factory floor, and the parts are delivered to your door. You get China's pricing and production capacity, with communication in Hebrew or English and the accountability of an Israeli company.
Why not work directly with a factory in China
- Communication gaps. A misunderstood drawing change can arrive as a full shipment of bad parts.
- No design review before tooling. The mold is the largest cost in the project, and fixing it after it is built is slow and expensive.
- Remote quality control. Without someone at the factory, you find problems only when the goods reach Israel.
- Logistics. Shipping, customs and coordination between suppliers fall on you.
What GoldMold does for you
- Engineering review before you spend. Emmanuel Goldschmidt, a Technion mechanical engineer, personally reviews drawings and files and recommends design and material changes.
- Fast quotation.
- Tooling and first samples. GoldMold's engineers in China follow mold building, first parts (T1) and correction rounds, usually one to three.
- Serial production at factories we have worked with for years, matched to the part and material.
- Delivery to your door. GoldMold handles shipping.
What we manufacture
- Precision CNC machining: 3- and 5-axis milling, turning and wire EDM, from tiny to large parts.
- Plastic injection molding in engineering plastics, from development runs to hundreds of thousands of units.
- Rubber and silicone, compression and injection, including LSR, 10–80 Shore A, and overmolding on plastic.
- Injection molds and rapid tooling.
- Technical and medical assemblies of dozens of parts, including Class 100,000 (ISO 8) cleanroom assembly.
- Coatings and surface treatments: anodizing, nickel, chrome, passivation, painting and printing.
Lead times
| Stage | Time |
|---|---|
| Mold order to first parts | 2 weeks (rapid tooling) to 4 weeks (complex mold) |
| Correction rounds | Usually 1–3 |
| Express shipping to Israel | About 4 days |
| Standard air freight | 8–10 days |
| Sea freight | 4–5 weeks |
Quantities
From a single unit to a million. The same team follows the project from the first development run to serial production.
Confidentiality
Many of our clients come from defense and medical industries. We do not publish client names, product photos or project details.
FAQ
Do I need to travel to China?
No. GoldMold's team in China is at the factory.
Can I order small quantities?
Yes, even a single unit.
Who is responsible for quality?
GoldMold. You work with one Israeli company, not the factory.
What certifications apply?
Our partner factories hold ISO 13485 for medical production. Medical materials come with a certificate of conformance (CoC). FDA or CE submissions are the client's responsibility; we provide manufacturing documentation.
How long until first parts?
Two to four weeks from mold order, depending on complexity.
Contact
Send your drawings or files and Emmanuel will reply with comments and a quote.
Phone: +972-4-8110531 · Mobile: +972-54-4482065 · Email: [email protected] · 22 HaAshlag St., Haifa, Israel