Rapid Tooling for Small and Medium Series

A rapid tool is an injection mold made of soft steel, designed for small and medium production series. It lasts for tens of thousands of parts, is built in about half the time of a standard production mold, and costs tens of percent less. At GoldMold, first parts from a rapid tool arrive in about two weeks.

Production takes place in China, supervised by GoldMold's own engineers on site. Every project is personally managed by Emmanuel Goldschmidt, a Technion-trained mechanical engineer who has managed manufacturing in China since 1997.

Rapid tool vs. standard production mold

Rapid tool Standard production mold
Mold material Soft steel To production requirements
Best for Small and medium series, up to tens of thousands of parts Large series
Time to first parts About two weeks Up to about four weeks for a complex mold
Cost Tens of percent less Higher

Who it is for

  • Startups moving from development to production that need real parts in the final material before investing in a production mold.
  • Small and medium series, when a full production mold is not justified.
  • Market tests and pilots before full-scale production.

What we mean by small and medium series

Series Units
Small 10–100
Medium 100–500
Large 500 up to 1 million

Silicone: compression molds for development

For silicone parts in development quantities, we make compression molds in a very short time. When a part must be flash-free, transparent or thin-walled, we move to LSR injection molding. See LSR silicone injection and compression molding.

The mistake to avoid

The most common mistake when moving to production is going to tooling before the design is 100% final, or with the wrong material. The result can be a delay of six months to a year, and in extreme cases an immature product reaching the market and damaging the whole project. That is why Emmanuel personally reviews the drawings before a mold is built, and recommends changes where needed.

Process

  1. Drawing review and design and material recommendations.
  2. Fast quotation.
  3. Mold build and first parts in about two weeks, usually with 1–3 correction rounds until approval.
  4. Series production.
  5. Delivery to the customer: express in about 4 days, regular air freight in 8–10 days, sea freight in 4–5 weeks. GoldMold handles all logistics.

FAQ

How many parts does a rapid tool last?

Tens of thousands of parts. It is made of soft steel.

How much time and money does it save compared with a standard mold?

About half the time, and tens of percent of the cost.

How long until first parts?

About two weeks from ordering the mold.

What happens when quantities grow?

We move to a production mold. Our advantage is that we scale quantities fast, from a small series up to a million units.

Contact us

Send your drawing or CAD file to Emmanuel Goldschmidt. He will review it personally and get back to you with comments and a quote.

Mobile: +972-54-4482065 · Office: +972-4-8110531 · Email: [email protected] · 22 Ha'ashlag St., Haifa, Israel

חייג צור קשר